Plans move forward for Moores Mill Road bridge replacement after Atlanta City Council vote
The Atlanta City Council approved plans to speed up the replacement of the Moores Mill Road bridge over Peachtree Creek.
The 102-year-old bridge has been closed since October, and will remain so, after a heavy equipment vehicle hit it, causing portions to buckle and make it unsafe to drive on.
[DOWNLOAD: Free WSB-TV News app for alerts as news breaks]
Channel 2 Action News flew over the bridge when it happened, showing the damage to structural support and a water line at the bridge.
In the intervening weeks, repair crews have worked on the bridge to determine what can be done to fix it and how to do so for longer-term safety.
TRENDING STORIES:
- Bridge closed for repairs staying blocked another week
- Moores Mill Road bridge still closed; here’s what drivers need to know about detours
- ‘Heavy vehicle’ hit Moores Mill Road bridge, causing partial collapse
- RAW VIDEO: Bridge over Moores Mill Road closes due to structural issue
At Monday’s council vote, the work to replace the bridge is being expedited.
According to city council documents, the Moores Mill Road bridge is among the top 15 most in need of replacement in the area.
Now approved, the replacement ordinance in city council calls for a 250-foot-long, 45 to 50-foot wide bridge built with two 11′ lanes, sidewalks on both sides of the bridge and roadway elevation set three to five feet above the current crossing to keep the new deck out of the area’s flood zone.
Going forward, the Atlanta Department of Transportation is tasked with putting together a feasibility study, preliminary engineering assessment, cost estimate and a portfolio of the most immediate funding options and a project schedule to replace the bridge, though the actual request for those items will have to come from Mayor Andre Dickens, per the ordinance.
[SIGN UP: WSB-TV Daily Headlines Newsletter]
Ver nota original ↗
¿Querés un resumen rápido de esta noticia, hecho por nuestra IA?
